A total of 133,316m3 was dredged from the entrance in August and September of 2021.
Placement locations and volumes associated with the dredging are as follows:
| Estimated Sand Delivery (cubic metres) | Location | 
|---|---|
| 14,729 | Bilinga/Tugun | 
| 59,061 | Snapper Rocks East | 
| 52,181 | Duranbah | 
| 7,345 | Fingal | 